The only Vessel in her Class able to Transport and Transport 6 Ultra Long XXL Mono-piles up to 145 m Long in One Single Turn-around.
The Vessel allows for large CAPEX cost savings with the Unique up-ending Technique eliminating expensive Up-ending Tools and other Mission-equipments.
In combination with the Heavy lift Crane Vessel the SUSTAINABLE INSTALLER we are able to Transport and Install 12 Ultra Long XXL Mono-piles in the by Offshoretronic develop “TANGO-Mode” good for approximately 240 Mega Watt of WTG Foundations in One Single Turn-around.
The Sustainable Transporter is equipment with 4 Knuckle boom Cranes to assist with the safe Hook-up process of the Large Lifting slings and Mono-Pile lifting Tools to the large XXL Foundation piles or Jackets. This is a unique feature to allow for best possible safe lifting operations.